DATA TRANSFER IN THE AUTOMATED SYSTEM OF PARALLEL DESIGN AND CONSTRUCTION
Pages 243 - 247
This article covers data transfer processes in the automated system of parallel design and construction. The authors consider the structure of reports used by contractors and clients when large-scale projects are implemented. All necessary items of information are grouped into three levels, and each level is described by certain attributes. The authors drive a lot of attention to the integrated operational schedule as it is the main tool of project management. Some recommendations concerning the forms and the content of reports are presented.
Integrated automation of all operations is a necessary condition for the successful implementation of the new concept. The technical aspect of the notion of parallel design and construction also includes the client-to-server infrastructure that brings together all process implemented by the parties involved into projects. This approach should be taken into consideration in the course of review of existing codes and standards to eliminate any inconsistency between the construction legislation and the practical experience of engineers involved into the process.
DOI: 10.22227/1997-0935.2012.12.243 - 247
- Volkov A.A, Lebedev V.M. Proektirovanie sistemokvantov rabochikh operatsiy i trudovykh stroitel’nykh protsessov v srede informatsionnykh tekhnologiy [Design of System Quanta of Operational and Labour Processes in the Information Technologies Environment]. Vestnik MGSU [Proceedings of Moscow State University of Civil Engineering]. 2010, no. 2, pp. 293—296.
- Volkov A.A., Lebedev V.M., Kulikova E.N., Pikhterev D.V. Upravlenie i logistika v stroitel’stve: informatsionnye osnovy [Management and Logistic in the Construction Industry: Information Fundamentals]. Collected papers of the 19th Polish-Slovak Seminar «Theoretical Fundamentals of Construction». Moscow, ASV Publ., 2010, pp. 407—412.